Resource Type

Journal Article 900

Conference Videos 44

Year

2024 1

2023 48

2022 89

2021 81

2020 54

2019 48

2018 58

2017 55

2016 66

2015 40

2014 47

2013 46

2012 33

2011 50

2010 36

2009 17

2008 38

2007 20

2006 14

2005 16

open ︾

Keywords

management 49

engineering management 39

Three Gorges Project 33

project management 23

construction management 15

sustainable development 15

China 11

innovation 11

risk management 11

Three Gorges Project ship lift 9

construction 9

management system 8

ship lift 8

thermal management 8

Software-defined networking (SDN) 6

engineering 6

construction project 5

emergency management 5

knowledge management 5

open ︾

Search scope:

排序: Display mode:

Identifying stakeholders’ roles and relevant project documents for 4D-based collaborative decision making

Veronika BOLSHAKOVA, Annie GUERRIERO, Gilles HALIN

Frontiers of Engineering Management 2020, Volume 7, Issue 1,   Pages 104-118 doi: 10.1007/s42524-019-0041-4

Abstract: building information modelling (BIM) models and methods, we need to develop a precise knowledge of which projectThis article studies the convergence between uses of 4D BIM and digital project documents.elements will contribute to propose 4D BIM as DM support on architecture engineering construction (AECIt then introduces a proposition for 4D BIM uses implementation by the project development phase.

Keywords: BIM     4D BIM     4D BIM use     AEC project management     collaboration     decision making    

CAS and ABM-based Demolition Waste Management Research in the AEC Industry

Zhi-kun Ding,Yi-fei Wang,Jin-chuang Wu

Frontiers of Engineering Management 2016, Volume 3, Issue 1,   Pages 18-23 doi: 10.15302/J-FEM-2016004

Abstract: continual growth of demolition waste quantities, it is urgent to research how to implement effective managementBased on the theory of complexity, this paper analyzes the demolition waste management from the perspective

Keywords: demolition waste     complexity science     agent-based modeling    

Linking elements to outcomes of knowledge transfer in the project environment: Current review and future

Frontiers of Engineering Management 2022, Volume 9, Issue 2,   Pages 221-238 doi: 10.1007/s42524-022-0195-3

Abstract: A project is a specific effort to create a unique product, so it is a favorable place for knowledge creationKnowledge can be transferred inside and outside projects and their parent project-based organizations, thus affecting project performance and organizational competitiveness.They divided KT in the project environment into three levels according to the transfer scenario: Intra-project, cross-project, and cross-organizational KT.

Keywords: knowledge transfer     knowledge management     project management     project environment     literature review    

Last Planner System and Scrum: Comparative analysis and suggestions for adjustments

Roshan POUDEL, Borja GARCIA de SOTO, Eder MARTINEZ

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 359-372 doi: 10.1007/s42524-020-0117-1

Abstract: This study provides a critical review of the concepts of Agile, Lean, Scrum, and Last Planner System (LPS). A comparative analysis is conducted between LPS and Scrum to expand LPS by considering Scrum’s best practices. Eight dimensions, namely, 1) origins, 2) main purpose, 3) overall system/framework process, 4) tools or artifacts maintained by the team, 5) team composition and main roles, 6) regular events or team meetings, 7) metrics/dashboards, and 8) approach to learning, are evaluated. After analyzing side by side the eight dimensions, it was found that many aspects from Scrum already exist in LPS in the same or similar form. However, the authors identify four main elements from Scrum that can be leveraged to improve the LPS benchmark, such as considering the Scrum “Increment” concept into LPS, having a clear definition of roles and responsibilities, or adding an equivalent to a Scrum Master to have a designated “rule keeper” in LPS. These opportunities to be considered in new LPS benchmarks need to be tested and validated with real applications. To the best of the authors’ knowledge, this work is the first to comprehensively compare Scrum (Agile) and LPS (Lean) and could be seen as a contribution toward the evolution of the Last Planner System for the academic and industrial environments.

Keywords: Lean Construction     Last Planner System     Agile     Scrum     comparative analysis     AEC projects     project teams    

Strengthening Project Management to Attain Overseas Blocks with High Potential for Exploration

Shu-lin Zhang

Frontiers of Engineering Management 2016, Volume 3, Issue 4,   Pages 331-337 doi: 10.15302/J-FEM-2016058

Abstract: The uniqueness of new overseas venture evaluation in short assessing cycle and limited data make projectmanagement vital.Project management includes human resource allocation, quality control and effective communication.Directed by the new overseas venture evaluation system, three-level quality control and management of

Keywords: new overseas venture evaluation     exploration     project management     quality management     assessing system    

Organizational evolution of project management teams over the whole lifecycle of megaprojects: Case study

Frontiers of Engineering Management   Pages 439-454 doi: 10.1007/s42524-022-0211-7

Abstract: Project management teams are critical in the implementation of megaprojects, but their evolution throughoutthe project lifecycle has not been clearly explained.retrospective case study of the Hong Kong–Zhuhai–Macao Bridge (HZMB) project.The organizational evolution is examined in terms of management objectives, management content, and organizationalThe organizational evolution of the HZMB project management team exhibits stage differentiation with

Keywords: megaproject     organizational evolution     whole lifecycle management     project management team    

Innovation and development of BeiDou Navigation Satellite System (BDS) project management mode

Changfeng YANG

Frontiers of Engineering Management 2021, Volume 8, Issue 2,   Pages 312-320 doi: 10.1007/s42524-021-0155-3

Abstract: Zachary A. COLLIER, James H. LAMBERT. [J]. Front. Eng, 2020, 7(2): 172-181.Shanlin YANG, Jianmin WANG, Leyuan SHI, Yuejin TAN, Fei QIAO. [J]. Front. Eng, 2018, 5(4): 420-450.Yongkai ZHOU, Hongfeng CHAI. [J]. Front. Eng, 2017, 4(2): 127-137.Eric SCHEEPBOUWER, Douglas D. GRANSBERG, Carla Lopez del PUERTO. [J]. Front. Eng, 2017, 4(1): 49-57.Jonathan Jingsheng SHI, Saixing ZENG, Xiaohua MENG. [J]. Front. Eng, 2017, 4(1): 41-48.David A. Wyrick,Warren Myers. [J]. Front. Eng, 2016, 3(3): 203-205.Elizabeth A. Cudney,William L. Gillis. [J]. Front. Eng, 2016, 3(3): 224-230.Ling-ling Zhang,Ming-hui Zhao,Qiao Wang. [J]. Front. Eng, 2016, 3(2): 136-143.Chuan-jun Zheng,Hu Cheng. [J]. Front. Eng, 2015, 2(3): 304-310.Yong Shi. [J]. Front. Eng, 2015, 2(3): 293-303.Qiao Xiang. [J]. Front. Eng, 2015, 2(3): 249-260.Wen Ling. [J]. Front. Eng, 2015, 2(2): 173-177.Hong-feng Chai. [J]. Front. Eng, 2015, 2(2): 165-172.Hiral Shah,Walter Nowocin. [J]. Front. Eng, 2015, 2(1): 60-63.William L. Gillis,Elizabeth A. Cudney. [J]. Front. Eng, 2015, 2(1): 39-51.

Keywords: BDS     engineering management     systems engineering    

Large Scale Infrastructure Projects: The Art of Project or Change Management?

Geert Letens,Kurt Verweire,Peter De Prins

Frontiers of Engineering Management 2016, Volume 3, Issue 3,   Pages 197-202 doi: 10.15302/J-FEM-2016033

Abstract: in the construction industry in general and an inevitable challenge for large scale infrastructure projectinsights over many years of study and practice, and has been validated through an extensive review of the managementsuccessfully deal with change goes beyond the traditional techniques of managing change from a program or projectmanagement perspective.

Keywords: large scale project management     organization development and change     batteries of change model    

Management innovation of Chang’e-5 project

Frontiers of Engineering Management 2021, Volume 8, Issue 4,   Pages 620-626 doi: 10.1007/s42524-021-0165-1

Keywords: lunar exploration     sample return     systems engineering     project management    

Study on systematically evaluating models for project performance and improvement

Li Zhenyou,He Jishan

Strategic Study of CAE 2011, Volume 13, Issue 8,   Pages 10-14

Abstract:

Project systematical evaluation is actually the important and necessarytool for the project-driven company to continuously improve their project performance and efficiencyThis study tried to improve the project excellence model (known as PE model) by means of clarifying andprocesses and performance and gain and loss for project stakeholders.knowledge management for project-driven companies.

Keywords: project evaluation     project management     PE model     project knowledge management    

Ecological Risk Management of Drinking Water Project: The Case Study of Kunming City

Ji-liang Zheng,Jun Hu,Xuan Zhou,Ching Yuen Luk

Frontiers of Engineering Management 2015, Volume 2, Issue 3,   Pages 311-319 doi: 10.15302/J-FEM-2015045

Abstract: The ecological risk management of drinking water project is an important means of ensuring the safetyBased on ecological risk assessment and management theories, this paper establishes an ecological riskmanagement model and assessment system with the aim of providing theoretical guidance and scientificIts ecological risk management of drinking water has attracted the attention of both the local government

Keywords: drinking water project     ecological risk     ecological risk assessment     risk management    

Strategic Project Management to Use the Grand Challenge Scholars Program to Address Urban Infrastructure

David A. Wyrick,Warren Myers

Frontiers of Engineering Management 2016, Volume 3, Issue 3,   Pages 203-205 doi: 10.15302/J-FEM-2016046

Abstract: This paper will investigate the strategic project management taken by one university to provide an academic

Keywords: Grand Challenges     urban infrastructure development     engineering management     system of systems     strategicmanagement     engineering management case study    

Building of Post-project Management

Yu Han,Yu-fei Li,Hu Cheng

Frontiers of Engineering Management 2014, Volume 1, Issue 4,   Pages 353-357 doi: 10.15302/J-FEM-2014051

Abstract: Traditional project management often ignores problems arising after project completion such as valueThis paper advances the concept of “post-project”, builds a framework for post-project management withcase analysis, as the social development and new requirements for project management by environmentalPost-project management encompasses a series of management and technical activities including updatingPost-project management can realize the sustainable development of project and society.

Keywords: project management     life cycle     project update     project remake     project removal     project restoration     project recycling    

Meta-synthesis management framework of a complex project: A case study of the deck pavement project of

Qiang MAI, Xing-lin GAO, Shi AN, Ding LIU, Ming LIU

Frontiers of Engineering Management 2018, Volume 5, Issue 1,   Pages 4-16 doi: 10.15302/J-FEM-2018076

Abstract: design and construction process of complex projects introduce great challenges to their organization and managementThe traditional methods, represented in the project management body of knowledge (PMBOK) guide, can solveBased on the management practice implemented in the deck pavement project of the Hong Kong-Zhuhai-MacaoBridge (HZMB), in this work, we propose a meta-synthesis management framework for a complex projectcomplex problems in the management practice of a complex project, and develops the methodology of meta-synthesis

Keywords: complex project     meta-synthesis management     Hong Kong-Zhuhai-Macao Bridge     exploration strategy     exploitation    

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Frontiers of Engineering Management 2020, Volume 7, Issue 3,   Pages 384-395 doi: 10.1007/s42524-019-0070-z

Abstract: For many years, project management maturity models (PMMM) derived from the software industry have broughtTo verify the effectiveness of the proposed model, we conduct a case study on the overall project management

Keywords: construction consulting services     project management maturity model     non-process factors     Expo    

Title Author Date Type Operation

Identifying stakeholders’ roles and relevant project documents for 4D-based collaborative decision making

Veronika BOLSHAKOVA, Annie GUERRIERO, Gilles HALIN

Journal Article

CAS and ABM-based Demolition Waste Management Research in the AEC Industry

Zhi-kun Ding,Yi-fei Wang,Jin-chuang Wu

Journal Article

Linking elements to outcomes of knowledge transfer in the project environment: Current review and future

Journal Article

Last Planner System and Scrum: Comparative analysis and suggestions for adjustments

Roshan POUDEL, Borja GARCIA de SOTO, Eder MARTINEZ

Journal Article

Strengthening Project Management to Attain Overseas Blocks with High Potential for Exploration

Shu-lin Zhang

Journal Article

Organizational evolution of project management teams over the whole lifecycle of megaprojects: Case study

Journal Article

Innovation and development of BeiDou Navigation Satellite System (BDS) project management mode

Changfeng YANG

Journal Article

Large Scale Infrastructure Projects: The Art of Project or Change Management?

Geert Letens,Kurt Verweire,Peter De Prins

Journal Article

Management innovation of Chang’e-5 project

Journal Article

Study on systematically evaluating models for project performance and improvement

Li Zhenyou,He Jishan

Journal Article

Ecological Risk Management of Drinking Water Project: The Case Study of Kunming City

Ji-liang Zheng,Jun Hu,Xuan Zhou,Ching Yuen Luk

Journal Article

Strategic Project Management to Use the Grand Challenge Scholars Program to Address Urban Infrastructure

David A. Wyrick,Warren Myers

Journal Article

Building of Post-project Management

Yu Han,Yu-fei Li,Hu Cheng

Journal Article

Meta-synthesis management framework of a complex project: A case study of the deck pavement project of

Qiang MAI, Xing-lin GAO, Shi AN, Ding LIU, Ming LIU

Journal Article

Project management maturity in construction consulting services: Case of Expo in China

Yongkui LI, Qing YANG, Yan ZHANG

Journal Article